CUC to use more client generated power
(CNS Business): The Electricity Regulatory Authority has approved a revision to the current Feed-in Tariffs (FITs) programme, which allows people who have their own source of alternative power generation, such as solar panels and wind turbines, to remain connected to the CUC grid and feedback electricity they generate. The revision increases the maximum total capacity available from 2MW to 3MW. ERA Managing Director Charles Farrington said consumers have found the FIT programme to be economic and it has accelerated the installation of renewable energy in recent months. Read more on CNS Business
Category: Local News